GM T800 Capacity Overflow (Power Seat Adjuster Assembly)
Tube Technologies tooled up GM T800 interim process to meet our customers' mass production overflow; a process involving assembly that would normally have taken 3 to 4 months was tooled up in 3 weeks through;

1) Reorganizing current work cells to utilize existing equipment.

2) Utilizing internal tooling resources on a 24/7 basis.

3) Redesigning and engineering the product to accommodate the interim process without jeopardizing or compromising product,
quality or function.

4) Establishing a personnel work group for demonstration and training purposes and successfully merging our Operator Group with the Process Engineering Group. The result was a highly
trained and self sustained work group.

This process ran successfully for 7 months with zero customer concerns.

 